THE STUDY
A SolGen hybrid generator replaced a 60kVA diesel generator at Warwick Folk Festival, powering the festival offices, phone and laptop charging, mobility scooter charging, festoon lighting and the accessible buggy service. On a greenfield site with no mains power, the unit ran across the full build, festival and clear-down period, with the site running entirely on solar power for 6 of the 14 days.
CLIENT
Warwick Festival
DATE OF STUDY
16th July – 29th July
LOCATION
Warwick, Warwickshire
OTHER INFO
Fuel Diesel Price: £1.45p
*Generator – 60kVa assuming 50% for 24 hours/day @ 5 l/hr
THE RESULTS
MONEY SAVED
Saved
£1,979
CO2 Saved
Saved
4,327 kg
FUEL SAVED
Saved
1,365 L
GENERATOR RUNTIME
Reduced by
81%
THE STUDY
A 63kVa Static SolGen powered the Cambridge high usage site with 3 offices units, a toilet block , a dry room and water browser. On a 24 Hours, Mon to Sun site. Initially without any power management controls, power was being consumed 24/7. The SolGen was able to eliminate this with the inbuild controls and to supply the power to this setup over 52 Days while using 493L of fuel.
CLIENT
Skanska
DATE OF STUDY
29th July - 18th September
LOCATION
Cambridge
OTHER INFO
Fuel Diesel Price: £1.45p
*Generator – 60kVa assuming 50% for 24 hours per day @ 6 l/hr
THE RESULTS
MONEY SAVED
Saved
£10,142
CO2 Saved
Saved
22,174 kg
FUEL SAVED
Saved
6,995 L
GENERATOR RUNTIME
Reduced by
94%
THE STUDY
Two 52kVa SolGens is powering a satellite site supporting the construction of a Solar Farm on a 30 Week contract. The Lancaster Site is powered 14 Hours, Mon to Sun. The Units have been able to supply the power to this setup throughout the winter so far for 198 working Days while using 9,982 L of fuel.
CLIENT
Smart Watch
DATE OF STUDY
23rd September - 1st April
LOCATION
Durham
OTHER INFO
Fuel Diesel Price: £1.45p
*Generator – 100 kVa assuming 60% for 12 hours per day @ 12 l/hr
THE RESULTS
MONEY SAVED
Saved
£33,271
CO2 Saved
Saved
72,738
FUEL SAVED
Saved
22,946 L
GENERATOR RUNTIME
Reduced by
75%
THE STUDY
A 63kVA Static Solgen powered a satellite site for the decommissioning of a wind turbine site. The Norkfolk Site was powered 12 Hours, Mon to Fri. The Unit was able to supply the power to this setup for 33 working Days while using 340L of fuel.
CLIENT
Business in Wind
DATE OF STUDY
28th August -10th Oct
LOCATION
Satellite site
OTHER INFO
Fuel Diesel Price: £1.45p
*Generator – 45kVa assuming 50% for 12 hours per day @ 5 l/hr
THE RESULTS
MONEY SAVED
Saved
£5,820
CO2 Saved
Saved
12,730kg
FUEL SAVED
Saved
4,016L
GENERATOR RUNTIME
Reduced by
87.5%
THE STUDY
A 52kVa Mobile SolGen powered the Suffolk site comprising of 3 offices units, a toilet block and water browser. For 24 Hours, Mon to Sun. The Unit was able to supply the power to this setup for 43 Days while using 132L of fuel.
CLIENT
Tier 1 Rail Contractor
DATE OF STUDY
24th July - 5th September
LOCATION
Suffolk
OTHER INFO
Fuel Diesel Price: £1.45p
*Generator – 45kVa assuming 50% for 24 hours per day @ 5 l/hr
THE RESULTS
MONEY SAVED
Saved
£7,290
CO2 Saved
Saved
15,938 kg
FUEL SAVED
Saved
5.028 L
GENERATOR RUNTIME
Reduced by
99%